Electronic fee collection. Requirements for urban dedicated short-range communication Ingestion-build-109673
$153.00
Description
Electronic fee collection. Requirements for urban dedicated short-range communication Ingestion-build-1096731 Scope This technical report analyses DSRC Urban Charge Point Requirements including the following issues: The core requirements and functionality that must be provided within DSRC equipment in an urban context; The potential aesthetic impact; How to handle the different traffic conditions in urban areas; Accommodation of the diversity of road users; The potential need to address highly variable topology; A wide variety of installation challenges;
the smart city concept model (SCCM) (see ISO 30182) and the data framework used for sharing data and information services (see PAS 183)
resistance to corrosion (when sealed)
Standardization in the process of overhead line conductors ensures better safety
flanged housings and take-up housings
Who is BS EN 60360 - Lamp cap for
This standard also describes a method for assessing whether the noise referred to is likely to give rise to complaints from people residing in the building
have not been covered in BS EN 16890:2017 and therefore BS 1877-10:2011 + A1:2012 can still be used to assess these products
BS 7121-2-5 has been updated by experts to bring it up to date with technological developments
shop primers
and the need to incorporate automatic changeover devices
The contents of DD CLC/TS 50131-7 include:
Pressurization principle
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 29.99
US$ 18.99
US$ 16.00
US$ 28.99
US$ 18.99
US$ 27.00