Code of practice for the planning, design, setting up and use of temporary suspended access equipment Ingestion-build-65808 Clause 1 Scope
$161.00
Description
Clause 1 Scope
ISO 8601-2 details basic rules for the prevention of misunderstanding the date and time format representations for information interchange
compressed air supply system
assembly or hoods
Code of practice for the planning, design, setting up and use of temporary suspended access equipment Ingestion-build-65808 Clause 1 ScopeBS 5974: 2010 Code of practice for the planning, design, setting up and use of temporary suspended access equipment Temporarily suspended access equipment (TSAE) support or contain workers working at height on engineering and construction sites. BS 5974 gives guidance and recommendations on installing (erecting, altering and dismantling), maintaining, examining and using TSAE in a safe manner. It also sets out the responsibilities of all staff
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 37.95
US$ 37.95
US$ 37.95
US$ 37.95
US$ 37.95
US$ 37.95